VASH DIM

Location

Lviv, Pasichna street, 133

Status

implemented

Total area

15 456 m2

Start of design

2018

End of construction

2022

Customer

Vash Dim

Services:

  • detailed design
  • author's supervision

The construction of an apartment building is envisaged on the projected site. The main entrance to the projected residential buildings is provided from the Pasichna street and intra-quarter passages. Composite designed residential buildings are located evenly on the site, forming a building quarter. The number of storeys of the designed buildings is 9-12 floors, due to the number of storeys of the neighboring building.

  • The total number of apartments – 156.
  • Building area – 1732.6 sq.m.
  • The total area of the house – 15,456.21 sq.m.
  • Total construction volume – 61018 cubic meters.
  • Number of created working places – 122.

The project was implemented in cooperation with Archimatika, which developed the concept and approval design documentation.

section 4
section 3
section 2
section 1
18-33_VD_B7_6-1-2
18-33_VD_B7_5-1-2
18-33_VD_B7_4-1-2
18-33_VD_B7_3-1-2

The landscaping project envisages complex landscaping. Landscaping includes the organization of sidewalks, playgrounds, recreation areas and the organization of economic activities. The range of plants typical for our climate zone, as well as plants with highly decorative qualities were used in landscaping.

Residential_Pasichna_5
Residential_Pasichna_1
Residential_Pasichna_2
Residential_Pasichna_3

The house consists of four sections:

  • Section 1; 4. Number of floors – 12
  • Section 2; 3. Number of floors – 9

section 1

general model
10th floor
5th floor
2nd floor
scheme of engineering networks
18-33_VD_B7_S1_AR_v15-2
18-33_VD_B7_S1_AR_v11-2
18-33_VD_B7_S1_AR_v6-2
18-33_VD_B7_S1_AR_v3-2
18-33_VD_B7_S1_AR_v0-2

section 2

general model
8th floor
5th floor
3rd floor
scheme of engineering networks
structure scheme
18-33_VD_B7_S2_AR_v12-2
18-33_VD_B7_S2_AR_v9-2
18-33_VD_B7_S2_AR_v6-2
18-33_VD_B7_S2_AR_v4-2
18-33_VD_B7_S2_AR_v0-2
18-33_VD_B7_S2_AR_v01-2

Sections 1 and 4 are equipped with a stairwell type H1 with access directly to the outside, the stairwell has natural light on all floors. It is possible to enter the section from both sides. Vertical connections between the entrance hall and the living floors are provided by a stairwell and elevators: one passenger and one freight-passenger. Sections 2 and 3 are equipped with a stairwell type SK1 with access to the outside through the lobby, the stairwell has natural light on all floors. It is possible to enter the section from both sides. The passenger elevator shaft is located in the volume of the stairwell. The house has a basement for utilities and a cold attic. On the first floor of the sections there are built-in offices. In the center of each section there is a stair-lift unit.

section 3

general model
8th floor
5th floor
2nd floor
scheme of engineering networks
structure scheme
18-33_VD_B7_S3_AR_v11-2
18-33_VD_B7_S3_AR_v14-2
18-33_VD_B7_S3_AR_v16-2
18-33_VD_B7_S3_AR_v19-2
18-33_VD_B7_S3_AR_v0-2
18-33_VD_B7_S3_AR_v01-2

section 4

general model
9th floor
6th floor
3rd floor
scheme of engineering networks
structure scheme
18-33_VD_B7_S4_AR_v16-2
18-33_VD_B7_S4_AR_v12-2
18-33_VD_B7_S4_AR_v8-2
18-33_VD_B7_S4_AR_v5-2
18-33_VD_B7_S4_AR_v0-2
18-33_VD_B7_S4_AR_v01-2
18-33_VD_B7_RM_4518_Full
18-33_VD_B7_RM_4542_Full
18-33_VD_B7_RM_4514_Full
18-33_VD_B7_RM_4510-2_Full

photo by Maryna Grynykha